Site Preparation for Storage Structures and Gazebos
A Level site is most important. Crushed Stone is recommended to evenly support a building or gazebo. The Stone provides a level base for the structure and creates a French-drain effect for rain runoff. Our storage sheds, garages, and gazebos come with 4"x4" pressure-treated foundation beams. This will eliminate the need for any concrete blocks. Elite Outdoor Structures offers mulitple site preparations options. Including: Stone pads, anchor kits, concrete pads, sono-tube footings, and stamped concrete. Perimeter and retaining wall options are also available. Your site work needs are never a problem. Please contact us to set up a site visit.
Standard Stone Pads by Elite Outdoor Structures
Pricing includes 3/4" 2b (cleaned) stone to accommodate ground up to 8” out of level. Prices apply to sites clear of protruding stumps and large rocks. Additionally, prices do not include any excavation of the site. Digging is not recommended unless the ground is severly out of level. If any additional charges need occur they will be submitted for your approval first.
Pricing for Crushed Stone Pads
Pad size and price are based on building sizes. However, the stone pad will be 1’ larger on all sides. (10x16 structure will have a 12x18 pad)
6’x6’ up to 12’x20’ $415 14’x20’ $475 10’x12’ $325 12’x24’ $445 14’x24’ $495 10’x16’ $350 12’x28’ $495 14’x28’ $555 10’x20’ $375 12’x32’ $555 14’x32’ $625 12’x12’ $350 12’x36’ $625 14’x36’ $685 12’x16’ $375 12’x40’ $685 14’x40’ $775
**Stone Delivery**
Want to level your own pad? Elite Outdoor Structures can supply you the crushed stone needed for your foundation. Current charges are $27.00 per ton and a $40.00 delvery charge within 10 miles of our Langhorne location.
Check the level of your site as follows:
1. Place a stake in the ground at the starting point (highest point) of the stone pad for your structure and attach a string to it.
2. Measure out the length of the stone pad. (1' larger on both sides) Place another stake
3. Hang a line level in the center of the string.( line levels are available at any hardware store for approx $3)
4. Raise or lower the string until the bubble in the level appears between the lines and tie it off.
5. Measure the distance between the string to the ground (low side).
6. This will determine the slope of the ground.
Your selected site must be level. So, please contact us with any questions you might have including doing the site work yourself.
Elite Outdoor Structures is not responsible for Customer-Supplied Site Preparations that are not leveled properly.